Baltkran contributes to construction of the Kerch Strait bridge | |||||
Baltkran won a tender for delivery of a double-cantilevered double girder wide-span gantry crane that will handle elements and section of the constructed bridge at the site of a manufacturing plant. The crane capacity is 50/10 t, bridge length is about 50 m. Installation of a magnetic beam is provided for on the crane. Delivery period is the beginning of 2017.
| |||||